Items where Author is "Ponniah, Venishri"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 1.

T.J., Deepak and Ponniah, Venishri (2017) Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach. Engineering, Construction and Architectural Management, 24 (2). pp. 308-325. ISSN 0969-9988

This list was generated on Thu Mar 28 16:38:27 2024 MYT.