T.J., Deepak and Ponniah, Venishri (2017) Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach. Engineering, Construction and Architectural Management, 24 (2). pp. 308-325. ISSN 0969-9988
Full text not available from this repository.Abstract
Purpose The purpose of this paper is twofold: first, to develop theoretical underpinnings using TCE, and second, to run the analysis using an advanced tool such as structural equation modeling (SEM). Design/methodology/approach This study was conducted in the construction industry in Tanzania. A questionnaire-based survey method was used. A total of 308 respondents participated in the study. The relationships between the cause and effect factors were analyzed using SEM. Findings The important findings are as follows:cost overrun can be explained by consultant-related and material-related factors; disputes can be explained by cost overrun; arbitration can be explained by consultant-related, cost overrun, and dispute factors; litigation can be explained by client-related, disputes, and arbitration factors; and abandonment can be explained by consultant-related, external-related, disputes, arbitration, and litigation factors. Originality/value The main contributions of this study are theoretical development and comprehensive analyses of “cause” and “effect” factors of delays in the construction industry.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Project management, Construction management, Modelling, Surveys, Sub-Saharan Africa, Multivariate analysis |
Subjects: | T Technology > TH Building construction |
Divisions: | Faculty of Engineering & Quantity Surveying |
Depositing User: | Unnamed user with email masilah.mansor@newinti.edu.my |
Date Deposited: | 22 Jun 2017 07:42 |
Last Modified: | 22 Jun 2017 07:42 |
URI: | http://eprints.intimal.edu.my/id/eprint/830 |