Ghazali, Wardah Musfirah (2014) The Causes, Impacts Of And Ways To Mitigate The Delay Effectively in Construction Industry. Other thesis, INTI INTERNATIONAL UNIVERSITY.
|
Text
BQSI 11.pdf Download (654kB) | Preview |
Abstract
The objectives of this study are to identify the causes of delays in construction, the impacts delays in construction and ways to mitigate the construction delays. Based on the literature review and survey questionnaire of this research were carry out, there are total seven categories are take part in the causes of delays in construction delays. The survey questionnaires were distributed to the targeted respondents either in consultant, contractor or client/developer type of organization. All the three objectives in this study are fully achieved. The top five important factors that are chosen by the three parties involved contributed to the causes of delays are shortage of labour, rework due to errors during construction, improper construction methods implement, low productivity level of labours and ineffective planning and scheduling of projects. The impacts of delays the most identified by the top five consist of frequent coordination between the parties involved, site management and supervision, proper project planning and scheduling, clear information and communication channels and effective strategic planning.
Item Type: | Thesis (Other) |
---|---|
Additional Information: | BQSI 11 |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Divisions: | Faculty of Engineering & Quantity Surveying |
Depositing User: | Unnamed user with email masilah.mansor@newinti.edu.my |
Date Deposited: | 21 Nov 2018 04:31 |
Last Modified: | 21 Nov 2018 04:31 |
URI: | http://eprints.intimal.edu.my/id/eprint/1232 |
Actions (login required)
View Item |