Tan, Ying Xuan (2013) Extension Of Time in Construction Industry. Other thesis, INTI INTERNATIONAL UNIVERSITY.
|
Text
BQSI 10.pdf Download (640kB) | Preview |
Abstract
Delay is the most common activities in the construction industry and it might be because of some relevant events caused by the owner, consultants, contractor, subcontractors and etc. these delays not only will cause the construction works beyond the period of completion and they might cause the overall project beyond the budget. All of the parties have the ability to prevent the EOT happen in this project in order to reduce any loss and expense of the client or themselves as well. For example, if the delay is caused the contractor then he/she needs to take responsibilities for the L.D in other way, the contractor will be given the additional time to complete the defaults as as the remaining work if delay is not the contractor’s fault. The main purpose to produce this research is to understand the EOT, identify the specification of the EOT, the factor of EOT as well as the prevention of EOT. Besides, this research also carried questionnaire survey with the experience personnel and contract administrative in order to understand more about the cause of EOT and try to find the way to reduce the probability of EOT happen in the construction industry
Item Type: | Thesis (Other) |
---|---|
Additional Information: | BQSI 10 |
Subjects: | Q Science > Q Science (General) Q Science > QA Mathematics |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Mathematics |
Depositing User: | Unnamed user with email masilah.mansor@newinti.edu.my |
Date Deposited: | 21 Nov 2018 03:14 |
Last Modified: | 21 Nov 2018 03:14 |
URI: | http://eprints.intimal.edu.my/id/eprint/1229 |
Actions (login required)
View Item |